The short version: a US university buys a humanoid robot the same way it buys a mass spectrometer — a written, dated quote goes to procurement, procurement issues a purchase order, and the terms that matter are the ones printed on that quote. Not a credit card at checkout. The trap is that most published advice about this asserts vendor payment terms — NET-30, grant-friendly invoicing, university account managers — that no page anywhere verifies. Below is the actual sequence, the checkout-verified prices and lead times we track with their dates, and the exact questions to put in writing before you commit a grant line to a platform.
The most common false start we see is a lab assuming a listed Chinese platform simply cannot be bought. It can. The Section 1260H designation restricts specific federal-contracting uses on a defined timeline — the NDAA Section 805 dates are June 30, 2026 and June 30, 2027 — and is not a consumer or university purchase ban.
Separately, the FCC added foreign-produced advanced robotic devices to its Covered List on July 28, 2026. That action governs new equipment authorizations; it does not retroactively unauthorize units already authorized and on the market. What it does change is model availability: at least one configuration we track is currently restricted in the US on FCC grounds, so eligibility and availability are two separate checks, not one.
Whether your particular funding source adds constraints on top of federal law is a question for your sponsored-programs office, and it is worth asking before you request a quote rather than after. Our full breakdown of the listing and the dates: is Unitree banned in the US? The 1260H list explained.
Robot pricing in this category moves often enough that a price you screenshot in September may not survive a February approval cycle. Your procurement office will require a quote document with a validity window regardless, so treat the numbers below as planning figures and let the quote be the document of record. These are checkout-verified US prices from our own tracking, each with the date we verified it:
| Platform / configuration | Checkout-verified US price | Verified |
|---|---|---|
| Unitree G1 Basic | $17,990 | Aug 11, 2026 |
| Unitree G1 Pro | $27,990 | Aug 11, 2026 |
| Unitree G1 Edu Standard | $43,900 | Aug 11, 2026 |
| Unitree G1 Edu Ultimate | $55,900–$73,900 | Aug 11, 2026 |
| Unitree H2 Plus Standard | $66,800 | Sep 1, 2026 |
| Unitree H2 Plus Ultimate | $83,600 | Sep 1, 2026 |
One budgeting note that catches first-time buyers: the education configurations are not the base unit with a discount, they are a different bill of materials — more degrees of freedom, developer SDK access, and in some cases a different compute module. Specify the configuration in the quote request, because the gap between trims on a single platform is larger than the gap between some platforms.
This is the question that decides whether a grant timeline survives, and it is the one product pages answer worst. Availability is per-configuration and it changes week to week. From our live tracker rows as of September 3, 2026:
| Platform | US delivery status | What it means for a PO |
|---|---|---|
| Unitree H2 / H2 Plus | In stock, US delivery (verified Sep 1–2, 2026); sold outright, deposit route withdrawn | Full order value on the PO, not a deposit line |
| Unitree G1 | 2–4 weeks | Fits inside most single-semester timelines |
| Unitree R1 | New orders ship in roughly 4–6 weeks | Order before, not after, the term you need it in |
| Unitree G1-D | US availability temporarily restricted on FCC grounds (confirmed Aug 5, 2026) | Do not write this configuration into a proposal without re-checking |
| CHRIC TP-01 | US availability pending FCC authorization | Not a current-cycle purchase |
The pattern worth internalizing: two platforms in the same product family can be weeks apart or one of them can be unavailable outright, and a product page will usually look identical for both. Current status for every model we cover is on the humanoid tracker board, and the quadruped equivalent is on the robot dog board.
The mechanics are ordinary: you request a quote against a named configuration, procurement converts the accepted quote into a purchase order, the PO goes to the seller, and payment follows whatever schedule the quote specifies. Nothing about a humanoid robot makes this exotic.
Here is where published advice gets ahead of the facts. Articles answering this question routinely assert which sellers offer NET-30 payment, which provide grant-friendly invoicing, and which assign dedicated university account managers. We went looking for the source of those claims and could not trace them to any page that verified them. Payment terms in this market are set per quote and per institution — by order value, by whether the unit is in stock, and by the buyer's credit posture — not by a blanket published policy.
So the operating rule is simple: a payment term does not exist until it is printed on your quote or order confirmation. An answer you only ever saw on a blog — including this one — is not a term. Ask for it in writing, and any competent channel will put it in writing.
Five things, and they are the five that procurement offices bounce orders over. Copy them into the request:
If you would rather not assemble that from scratch, our quote desk takes the configuration and returns a written quote — BotInfo responds within 24 hours — and we ask the seller those five questions on your behalf, including the payment-terms question, so the answers arrive documented rather than remembered.
If the purchase rides on a grant, your sponsored-programs office will want the robot to map onto an equipment line item with a defensible justification, and reviewers will want the choice of platform explained rather than asserted. For the Unitree G1 line we maintain a free procurement packet: checkout-verified pricing across every configuration, the regulatory position with dates, and budget-justification language written for NSF proposals and internal equipment requests. We send it to your work email, usually within one business day, regenerated with current verified prices rather than whatever was true when the PDF was first written.
Two practical notes from watching these go through. First, cite dated prices in the justification and say where they came from — a reviewer who can check your number is a reviewer who stops questioning it. Second, if the platform's availability is time-sensitive, say so explicitly in the justification; "this configuration is in stock for US delivery as of [date], with comparable units quoting in months" is a stronger argument than a bare price.
On arrival, check the unit against the quoted configuration before you close out the PO — degrees of freedom, compute module, and included accessories are the three that quietly differ. Then keep the dated quote, the order confirmation, and the delivery record together as one chain. Grant audits ask for exactly that chain, and reassembling it a year later from email is how a clean purchase becomes a finding.
In general yes — the Section 1260H listing restricts certain federal-contracting uses, not university purchases, and the July 2026 FCC action governs new equipment authorizations rather than units already on the market. The dates and the specific carve-outs that decide your case are in our eligibility guide.
An institutional PO is the normal instrument for hardware in this price class, but acceptance and payment terms are confirmed per order, in writing, on the quote — never by a published policy. Request a quote and ask for the terms explicitly.
It ranges from in-stock US delivery to multi-week builds depending on the platform and configuration, and at least one configuration we track is currently restricted on FCC grounds. Live status per model is on the humanoid tracker board.
Checkout-verified US pricing for the education configurations we track runs from $17,990 for a base G1 to $83,600 for an H2 Plus Ultimate, verified on the dates shown in the table above. Configuration, not platform, drives most of the spread.
If you know the configuration, go straight to a written quote — request one here and we will come back within 24 hours with the payment terms, lead time, and PO handling in writing. If you are still choosing the platform, start from live availability on the humanoid tracker board, and if the purchase will ride on a grant, take the G1 procurement packet with you to your sponsored-programs meeting.